How-To Connect and Disconnect Projects and Repos using Keypup

In this quick how-to tutorial, you will learn how to connect or disconnect your projects and repos from Keypup Development Intelligence solution.

Thomas Williams
Thomas Williams LinkedIn
• 3 min read
How-To Connect and Disconnect Projects and Repos using Keypup

To unleash Keypup’s full potential, we recommend connecting all active projects and repos to the platform during the trial period. This way, you will be able to compare projects against each other and see which ones are consuming most of your time. Linking this info to the most lucrative features / products, you will be able to gain insights on what has high value for you and how to manage time for the less lucrative yet needed ones.

At Keypup we want to make sure you are always in control of your development data and their access. For this reason we ask you to explicitly tell us which project(s) / repo(s) you wish to connect to Keypup.

Note that we do not fetch any code from your repositories. Instead, we harness all kinds of metadata so we can build comprehensive software development datasets.

To connect a new project / repository, go to the Settings at the bottom left section of your screen in the navigation menu.

Image

Then, select Apps & Projects.

Image

This will open automatically the Imported projects tab which will show you which projects/repositories are active and which ones are disabled. To connect, select the project(s) / repos by ticking the boxes and setting them as active clicking the** Import selected** button. To disconnect them, select them by ticking the boxes and set them as disabled selecting the Disable selected button.

Connecting projects / repos

Image

Image

Disabling projects / repos

Image

Note: you can search a project by name using the search bar, or see all projects /repos available from the connected apps (active or not) by selecting All from the status filter.

That's it! After a short period of time - depending on the volume of data contained in your projects / repos - you will see them set as active.

Image

Once your projects/repos are connected, you can build your dashboards / reports and insights through Keypup builder interfaces).

Note: you will be guided through all these steps on your first sign-up during your onboarding.

Any recommendations or tips? Ping us through the chat or contact us using this form.

Ready to Transform Your Analytics?

Join teams already using AI to make data-driven decisions faster than ever.

Most Recent Articles

The Approval Ring: When the Same Two Engineers Keep Approving Each Other's Pull Requests

The Approval Ring: When the Same Two Engineers Keep Approving Each Other's Pull Requests

A four-eyes review policy checks that someone else approved a pull request, not who. In a typical enterprise, 168 pairs of engineers mostly approve each other, on 17% of merged pull requests and 26% of the code. Learn what engineering leaders on Reddit say about reciprocal approvals and rubber-stamp review buddies, and how Keypup MCP measures approval concentration from review authors, pull request authors, review dates, review bodies and lines changed.

Liam Davis
The Mega-Ticket: When One Jira Issue Turns Into Fifteen Pull Requests

The Mega-Ticket: When One Jira Issue Turns Into Fifteen Pull Requests

Throughput counts issues, but one closed issue can hide one pull request or fifteen. In a typical enterprise, 14% of closed Jira issues need six or more pull requests, carry half the code that changed and take eight times longer to close. Learn what engineering leaders on Reddit say about tickets that never get split, and how Keypup MCP measures issue size through linked pull requests, lines changed, merge spans and story points.

Stephane Ibos
The Survivorship Trap: Your Cycle Time Only Counts the Work That Finished

The Survivorship Trap: Your Cycle Time Only Counts the Work That Finished

Cycle time is measured on closed work, so the items stuck in Blocked, In Review or QA for weeks never appear in it. In a typical enterprise, the median open item is twice as old as the median closed one, and a third of work in progress is already older than the 85th percentile the dashboard reports. Learn what engineering leaders on Reddit say about green cycle time charts and stuck work, and how Keypup MCP measures the age of open Jira issues, where they sit still and what code is behind them.

Arnaud Lachaume